The topping-out ceremony was celebrated. The new building was toasted with champagne. After the roofing, the interior work continued. The previously sandy floor was poured, the staircase to the offices was built and the new hall was connected to the old building. The building was inaugurated with a small Christmas party at the end of the year.
In January 2023 the new racks were delivered and installed. The new warehouse is operated semi-automatically and offers space for an additional 4,000 pallet spaces.
The warehouse is scheduled to be operational in the spring of 2023.